How I evaluate my project is I did good. I crushed the glass for asphalt for the roads and crushed the glass into sand for the sidewalks. I researched how much the equipment would cost. I need a chunk crusher witch would cost $650.000, fine crusher witch would cost $999.000, and the storage building cost $125.000. Total cost would be $1,774.000. The accomplishments I made this month was I crushed the glass into little pieces and into little partials. I also wrote a paper on everything I reached so far this year. The obstacles I faced were that I need a lot of money,and I need to find investors. I would need a lot of education on how to crush the glass for roads and sidewalks. We can't do it here but assume if the employes and Cody is looking into doing glass and see if they could it but it could fly by using Cody.